Dehradun. DRM, Moradabad Vineeta Srivastava paid a courtesy go to to Chief Minister Pushkar Singh Dhami on the Chief Minister’s residence on Thursday. On this event, there was an in depth dialogue about strengthening of railway infrastructure in the state, completed and progressing railway initiatives and future necessities. DRM, Moradabad Vineeta Srivastava knowledgeable the Chief Minister that many necessary railway initiatives have been efficiently completed in Uttarakhand. The new railway line project (27.45 km) connecting Roorkee to Deoband has been commissioned, below which new railway stations have been constructed at Banhera Khas and Jhabreda.
Apart from this, work associated to hurry enhance has additionally been completed on the foremost railway routes of the state, in which the Laksar-Haridwar rail part has been upgraded to 110 kilometers per hour, whereas a proposal has been offered to extend the pace of Saharanpur-Haridwar part to 110 kilometers per hour. He additionally knowledgeable that DPR has been authorized for 130 km per hour pace goal and routes have been recognized for 160 km per hour pace in the long run. He additional stated that works associated to ROB, RUB and LHS have been completed at many locations in Uttarakhand part together with Laksar, Landaura-Dhanaura, Roorkee, Chodiala and Aithal, which has considerably elevated the protection at railway crossings and diminished the issue of visitors jams at busy locations.
DRM Vineeta Srivastava additionally knowledgeable the Chief Minister that a number of necessary railway initiatives are presently in progress in the state. He knowledgeable that redevelopment work is being completed at Harrawala, Roorkee and Kotdwar railway stations below Amrit Bharat Station Scheme, which incorporates development of new station buildings, AC ready rooms, meals courtroom, disabled and pedestrian pleasant design, standardization of platform peak, platform shed, new and broad Foot Over Bridge (FOB) and improvement of trendy circulating and parking space. He additionally knowledgeable that complete redevelopment with capability enhance is proposed for Haridwar and Dehradun railway stations, in which world class passenger facilities, iconic terminal design, separation of arrivals and departures and higher exterior visitors system will likely be developed. Along with this, a new railway line project connecting Yog Nagri Rishikesh to Karnaprayag is below development, whose complete size is 125.20 kilometers. This project contains 12 stations, 35 bridges and 17 tunnels on the route and the work of main tunnels has been completed to the extent of 94 percent.